1948 Kenmore Restoration Posted by ericksaint on January 26, 2014 Posted in: Blog. Leave a Comment Before Power Switch Cleaned and rewired Knee control modified to foot for testing. Motor General Disassembly All Cleaned Up Timing Issues Needle Button Holes Here’s quick video I shot after all the cleanup and the machine was re-assembled. She lives. First Project Share this:
Snowshoeing IAT Stony Ridge 1.11.13 Posted by ericksaint on January 12, 2014 Posted in: Ice Age Trail. Leave a Comment GPS Data Gallery Share this:
You must be logged in to post a comment.