1948 Kenmore Restoration Posted by ericksaint on January 26, 2014 Posted in: Blog. Leave a Comment Before Power Switch Cleaned and rewired Knee control modified to foot for testing. Motor General Disassembly All Cleaned Up Timing Issues Needle Button Holes Here’s quick video I shot after all the cleanup and the machine was re-assembled. She lives. First Project Share this: Posts navigation ← Snowshoeing IAT Stony Ridge 1.11.13 IAT Janesville, Devil’s Staircase & Arbor Ridge 4.12.14 →
You must be logged in to post a comment.